|
This page is a visual representation of the installation process that our customers will go through while installing their new DIY Kitchen.
|
Visual Installation Process #1
|
|
 Empty Room
|
 Check plumbing
|
 Getting Started
|
 Placing Cabinets
|
|
 Placing Cabinets
|
 Finished Assembly
|
 Finished Assembly
|
 Finishing Touches
|
|
 Finishing Touches
|
 Finishing Touches
|
 Finished
|
 Finished
|
|
|
|
|
|
|
Visual Installation Process #2
|
|
|
|
 Tools Needed
|
 Starting
|
 Assembly of Cabinets
|
 Find Lowest Point of The Room
|
|
 Lowest Point of The Room
|
Measure Up 871mm From The Lowest Point In The Room, And Mark A Line
|
 Check The Plumbing
|
 Putting The First Cabinets In Line With 871mm Line, Start At Corner
|
|
 Continue Putting Cabinets Together, Ensuring They Are Level Back To Front, Side To Side
|
 Blind Corner, Each Cabinet 630mm From The Wall
|
 Corner Cabinet, With 180 Hinges
|
 Use The Feet To Adjust The Level
|
|
 Scribe The Panels To suite The Floor
|
 Cut Along The Scribe Line With A Jigsaw
|
 Scribe Panels To Fit To The Wall
|
 Mark Out The Bench Top To Fit Around Wall, Cut With Jigsaw
|
|
 Side The Bench Top Into Place
|
 Mark Out Hot Plate And Cut Out With A Jigsaw
|
 Mark Out Sink And Cut Out With A Jigsaw
|
 Use Bench Connectors, 10mm Spanner And PVA Glue To Join Bench Tops Together
|
|
 Progression
|
 Progression
|
 Progression
|
 Marking Out Handles
|
|
 Measuring Out Handles
|
Mark Out Position Of Handle With a Pencil
|
Drill Holes For Handles
Screw The Handles On |
The High Gloss Doors Come With Protective Wrapping, Take This Off
|
|
|
Clip On Kick Boards
|
Finished!!
|
| |